INTERSTATE 95 over ROUTE 162

I-95 AT EXIT 42 · County 009, Connecticut · Built 2005 · 7 Lanes · 105,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00157
Year Built
2005
Length
49.2 m (161.4 ft)
Max Span
46.2 m
Width
41.7 m (136.8 ft)
Lanes
7
Daily Traffic
105,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.