INTERSTATE-95 over ORANGE AVENUE

0.3 MI N OF ROUTE 121 · County 009, Connecticut · Built 1958 · 6 Lanes · 113,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00147
Year Built
1958
Length
20.7 m (67.9 ft)
Max Span
19.2 m
Width
41 m (134.5 ft)
Lanes
6
Daily Traffic
113,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.