INTERSTATE 95 over US ROUTE 1 SOUTHBOUND

INTERSTATE-95 EXIT NO. 24 · County 001, Connecticut · Built 1958 · 6 Lanes · 107,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00092
Year Built
1958
Length
21.2 m (69.6 ft)
Max Span
19.5 m
Width
38.9 m (127.6 ft)
Lanes
6
Daily Traffic
107,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.