INTERSTATE-95 over ROUND HILL ROAD

0.2 MI S OF ROUTE 135 · County 001, Connecticut · Built 1958 · 8 Lanes · 124,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00084
Year Built
1958
Length
17.4 m (57.1 ft)
Max Span
15.9 m
Width
58.2 m (190.9 ft)
Lanes
8
Daily Traffic
124,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.