WESTMINSTER BOULEV over BIG DRY CREEK | BIG DRY

0.5 MI S OF CHURCH RANCH · County 059, Colorado · Built 2002 · 2 Lanes · 4,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
WST15-10-J
Year Built
2002
Length
70.3 m (230.6 ft)
Max Span
33.8 m
Width
24.2 m (79.4 ft)
Lanes
2
Daily Traffic
4,300
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.