Seventh Street over Cache La Poudre River

0.2 Mi S of Eastman Pk Dr · County 123, Colorado · Built 1984 · 2 Lanes · 11,595 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
WIN017.0-064.0A
Year Built
1984
Length
43.3 m (142.1 ft)
Max Span
20.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
11,595
Material
Prestressed Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.