County Road 120 over CROW CREEK
1.3 MI E OF CR 83 · County 123, Colorado · Built 2020 · 2 Lanes · 84 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.856117, -104.252267
This bridge is in worse condition than 19.4% of bridges in County 123. The average bridge in Colorado is 0 years old; this one is 6 years old.
Bridge Details
- Structure #
- WEL120.0_085.0A
- Year Built
- 2020
- Length
- 15.4 m (50.5 ft)
- Max Span
- 14.5 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 2
- Daily Traffic
- 84
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.