County Road 120 over CROW CREEK

1.3 MI E OF CR 83 · County 123, Colorado · Built 2020 · 2 Lanes · 84 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

40.856117, -104.252267

This bridge is in worse condition than 19.4% of bridges in County 123. The average bridge in Colorado is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
WEL120.0_085.0A
Year Built
2020
Length
15.4 m (50.5 ft)
Max Span
14.5 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
84
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.