County Road 91 over Empire Intake Canal

1.3 Mi S of US Hwy 34 · County 123, Colorado · Built 2023 · 2 Lanes · 77 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
WEL091.0_038.0A
Year Built
2023
Length
18.3 m (60 ft)
Max Span
17.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
77
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.