County Road 54 over Big Thompson River

0.7 Mi E of Co Rd 13 · County 123, Colorado · Built 2024 · 2 Lanes · 7,403 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
WEL054.0_013.0A
Year Built
2024
Length
104.4 m (342.5 ft)
Max Span
35.1 m
Width
21.6 m (70.9 ft)
Lanes
2
Daily Traffic
7,403
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.