LINDEN AVENUE over PURGATOIRE RIVER
.1 MI W OF E. ELM ST · County 071, Colorado · Built 1989 · 2 Lanes · 856 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
37.173036, -104.499156
This bridge is in worse condition than 13.7% of bridges in County 071. The average bridge in Colorado is 0 years old; this one is 37 years old.
Nearby Bridges
I 25 ML NBND over LINDEN AVE
Built 1958
Americana Rd over Ditch
Built 1950
I 25 ML SBND over LINDEN AVE
Built 1968
COMMERCIAL STREET over PURGATOIRE RIVER
Built 1990
COLLEGE ST / CEDAR over PURGATOIRE RIVER
Built 1993
I 25 RAMP over SB ONRAMP FRM COMM. ST.
Built 2011
I 25 NBND OFF RAMP over NORTH COMMERCIAL STREET
Built 2010
ANIMAS ST over PURGATOIRE RIVER
Built 1962
I 25 ML NBND over SH12 RR CTY STS. DITCH
Built 2009
I 25 ML SBND over SH12 RR CITY ST DITCH
Built 2010
Bridge Details
- Structure #
- TP-18-AA
- Year Built
- 1989
- Length
- 68.9 m (226 ft)
- Max Span
- 33.3 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 2
- Daily Traffic
- 856
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.