CITY ST - MAPLE over SAN MIGUEL RIVER

50 FT S of SH145 · County 113, Colorado · Built 2001 · 2 Lanes · 685 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
TELLRD-MAPLE
Year Built
2001
Length
13.6 m (44.6 ft)
Max Span
12.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
685
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$241,000
Total Project Cost
$265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.