County Road 28 over Highline Canal

0.1 Mi. E. of Co. Rd. 5 · County 115, Colorado · Built 1998 · 2 Lanes · 26 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
SED28-5.1-28A
Year Built
1998
Length
9.1 m (29.9 ft)
Max Span
8.3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
26
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.