Co Rd 19 over Peterson Ditch

50 Ft. So. of Co. Rd. 30 · County 115, Colorado · Built 1988 · 2 Lanes · 520 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
SED19-30.0-3
Year Built
1988
Length
7.7 m (25.3 ft)
Max Span
7.7 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
520
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.