County Road 12 over Sand Creek

0.6 Mi E of Co. Rd. 39 · County 115, Colorado · Built 1969 · 2 Lanes · 86 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
SED12-39.6-12
Year Built
1969
Length
7.3 m (24 ft)
Max Span
6.6 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
86
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.