County Road 73 over White River

0.2 Mi N of St Hwy 64 · County 103, Colorado · Built 2021 · 2 Lanes · 21 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
RIOB-073-00.23A
Year Built
2021
Length
45.1 m (148 ft)
Max Span
43.3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
21
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.