RIVER STREET over SILVER CREEK

150 FT N of W SODA ST · County 033, Colorado · Built 1999 · 2 Lanes · 20 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 8 Very Good

Location

37.694767, -108.032561

This bridge is in worse condition than 44.4% of bridges in County 033. The average bridge in Colorado is 0 years old; this one is 27 years old.

Nearby Bridges

Bridge Details

Structure #
RICO-002
Year Built
1999
Length
8.2 m (26.9 ft)
Max Span
6.9 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
20
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$84,000
Total Project Cost
$92,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.