COUNTY ROAD 3E over RIO GRANDE RIVER
1.5 MI N OF CR 1S · County 105, Colorado · Built 1970 · 2 Lanes · 1,772 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.582628, -106.094189
This bridge is in worse condition than 12.3% of bridges in County 105. The average bridge in Colorado is 0 years old; this one is 56 years old.
Nearby Bridges
COUNTY ROAD 3E over EMPIRE CANAL
Built 1994
COUNTY ROAD 1S over EMPIRE CANAL
Built 2006
US 160 ML over EMPIRE CANAL
Built 1972
COUNTY ROAD 6E over SAN LUIS CANAL
Built 2005
COUNTY ROAD 6E over RIO GRANDE RIVER OVERFLO
Built 1985
COUNTY ROAD 6E over RIO GRANDE RIVER
Built 1972
US 285 ML over RIO GRANDE
Built 1971
COUNTY ROAD 3S over EMPIRE CANAL
Built 1968
COUNTY ROAD 102 over SAN LUIS VALLEY CANAL
Built 1993
CO RD 1 MI LANE over SAN LUIS VALLEY CANAL
Built 1993
Bridge Details
- Structure #
- RGDE03-00.60N
- Year Built
- 1970
- Reconstructed
- 1996
- Length
- 45.8 m (150.3 ft)
- Max Span
- 15.1 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,772
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.