COUNTY ROAD 9 over WILLOW CREEK DRAIN

.1 MI SOUTH OF SH 50 · County 099, Colorado · Built 1973 · 2 Lanes · 297 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
PR9-8-30.1-1D
Year Built
1973
Reconstructed
2004
Length
18.5 m (60.7 ft)
Max Span
17.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
297
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.