CO RD 4A/FS RD 400 over LIME CREEK
3 MI E OF RUEDI RESERVOIR · County 097, Colorado · Built 1955 · 1 Lanes · 41 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
39.3603, -106.685186
This bridge is in worse condition than 81.5% of bridges in County 097. The average bridge in Colorado is 0 years old; this one is 71 years old.
Nearby Bridges
COUNTY ROAD 4/105 over FRYING PAN RIVER
Built 1988
COUNTY ROAD 4/105 over N. FORK-FRYING PAN RIVER
Built 1996
COUNTY ROAD 4 over FRYING PAN RIVER
Built 1970
FDR 504 over FRYINGPAN RV
Built 1948
FDR 105-4B over FRYING PAN RV
Built 1964
NO DATA ENTERED over LIME CREEK
Built 2011
FDR 105-4A over FRYINGPAN RV
Built 1984
CR 4F/NAST COLONY over FRYING PAN RIVER
Built 1958
FDR 105-6C over FRYINGPAN RV
Built 1985
Bridge Details
- Structure #
- PIT-04A-1.0
- Year Built
- 1955
- Length
- 8.1 m (26.6 ft)
- Max Span
- 7.3 m
- Width
- 4.7 m (15.4 ft)
- Lanes
- 1
- Daily Traffic
- 41
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $31,000
- Total Project Cost
- $34,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.