COUNTY ROAD 11 over SNOWMASS CREEK
S END OF COUNTY ROAD 11 · County 097, Colorado · Built 1986 · 2 Lanes · 102 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
39.205136, -106.989222
This bridge is in worse condition than 81.5% of bridges in County 097. The average bridge in Colorado is 0 years old; this one is 40 years old.
Nearby Bridges
WOOD RD over BRUSH CREEK
Built 2008
WOOD RD over TRAUMA LANE
Built 2008
BRUSH CREEK ROAD over BRUSH CREEK/E MAYFLY TRL
Built 2023
TWO CREEKS DRIVE over SKI RUN
Built 1997
SLOPESIDE LN over OWL CREEK
Built 1998
PINE CREST DR over SKI RUN
Built 1998
PINE CREST DR over SKI RUN
Built 1998
PINE CREST DR over SKI RUN
Built 1998
PINE CREST DR over SKI RUN
Built 1998
COUNTY ROAD 9D over Capitol Creek
Built 1901
Bridge Details
- Structure #
- PIT-011-10.8
- Year Built
- 1986
- Length
- 9.8 m (32.2 ft)
- Max Span
- 8.5 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 102
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $129,000
- Total Project Cost
- $142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.