CANTERBERRY PARKWA over SULPHUR GULCH | SULPHUR

JUST S OF CANTERBERRY TL · County 035, Colorado · Built 1998 · 4 Lanes · 6,259 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
PAR CANTBRY-0.3
Year Built
1998
Length
31.6 m (103.7 ft)
Max Span
7.3 m
Width
27 m (88.6 ft)
Lanes
4
Daily Traffic
6,259
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$409,000
Total Project Cost
$450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.