US 160 ML over DRAW
34 miles West of Kim · County 071, Colorado · Built 1939 · 2 Lanes · 180 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
37.168594, -103.913853
This bridge is in worse condition than 56.6% of bridges in County 071. The average bridge in Colorado is 0 years old; this one is 87 years old.
Bridge Details
- Structure #
- P-21-H
- Year Built
- 1939
- Reconstructed
- 1958
- Length
- 9.4 m (30.8 ft)
- Max Span
- 8.6 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 180
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.