US 160 ML over DRAW

34 miles West of Kim · County 071, Colorado · Built 1939 · 2 Lanes · 180 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

37.168594, -103.913853

This bridge is in worse condition than 56.6% of bridges in County 071. The average bridge in Colorado is 0 years old; this one is 87 years old.

Nearby Bridges

Bridge Details

Structure #
P-21-H
Year Built
1939
Reconstructed
1958
Length
9.4 m (30.8 ft)
Max Span
8.6 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
180
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.