US 160 ML over SAN FRANCISCO CREEK

15.2 MI E OF JCT US 350 · County 071, Colorado · Built 1999 · 2 Lanes · 290 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P-20-T
Year Built
1999
Length
54.1 m (177.5 ft)
Max Span
26.7 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
290
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.