US 160 ML over DRAW

6.1 MI E OF JCT I 25 · County 071, Colorado · Built 1968 · 2 Lanes · 1,700 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
P-19-F
Year Built
1968
Length
6.8 m (22.3 ft)
Max Span
3.3 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
1,700
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.