I 25 ML SBND over POWELL ARROYO
19.4 MI SO OF AGUILAR RD · County 071, Colorado · Built 1969 · 2 Lanes · 6,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.196275, -104.497603
This bridge is in worse condition than 31.2% of bridges in County 071. The average bridge in Colorado is 0 years old; this one is 57 years old.
Nearby Bridges
I 25 ML NBND over POWELL ARROYO
Built 1948
COUNTY RD 71.1 over POWELL ARROYO CREEK
Built 1935
SH 239 ML over IRRIGATION CANAL
Built 2013
SH 239 ML over POWELL ARROYO
Built 1974
I 25 ML NBND over US 160C
Built 1958
I 25 ML SBND over US 160C ML
Built 1968
US 160 ML over BNSF RR
Built 1992
US 160 BYPASS over PURGATOIRE RIVER
Built 1988
SH 239 ML over CANAL
Built 1932
CO RD 73.2/DIAZ ST over ENGLEVILLE CANYON CREEK
Built 1994
Bridge Details
- Structure #
- P-19-AZ
- Year Built
- 1969
- Length
- 27.4 m (89.9 ft)
- Max Span
- 26.8 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 6,000
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.