SH 12 ML over PURGATOIRE RIVER

1.9 MI NW WESTON · County 071, Colorado · Built 2013 · 2 Lanes · 520 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
P-17-AG
Year Built
2013
Length
15.2 m (49.9 ft)
Max Span
13.7 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
520
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$217,000
Total Project Cost
$325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.