SH 159 ML over CULEBRA CREEK

S. EDGE OF SAN LUIS · County 023, Colorado · Built 1936 · 2 Lanes · 800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
P-15-C
Year Built
1936
Length
36.6 m (120.1 ft)
Max Span
14.9 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$145,000
Total Project Cost
$217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.