US 285 ML over CONEJOS RIVER
2.5 MI N OF ANTONITO · County 021, Colorado · Built 1929 · 2 Lanes · 3,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.101103, -106.007228
This bridge is in worse condition than 63.5% of bridges in County 021. The average bridge in Colorado is 0 years old; this one is 97 years old.
Nearby Bridges
US 285 ML over CONEJOS RIV.OVERFLOW
Built 1929
COUNTY ROAD 13 over CONEJOS RIVER
Built 1971
COUNTY ROAD 15 over CONEJOS RIVER
Built 1996
COUNTY ROAD E.5 over RIO SAN ANTONIO
Built 1994
COUNTY ROAD 16 over CONEJOS RIVER
Built 1974
US 285 ML over RIO SAN ANTONIO
Built 1938
COUNTY ROAD 16 over N. CONEJOS RIVER
Built 1995
COUNTY ROAD 16 over RIO SAN ANTONIO
Built 1976
COUNTY ROAD 17 over CONEJOS RIVER
Built 1991
COUNTY ROAD G over RIO SAN ANTONIO
Built 1989
Bridge Details
- Structure #
- P-12-B
- Year Built
- 1929
- Reconstructed
- 1961
- Length
- 49.7 m (163.1 ft)
- Max Span
- 15.1 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,200
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.