COUNTY ROAD FF over OTERO CANAL
.1 MI E OF CR 14 · County 089, Colorado · Built 1966 · 2 Lanes · 154 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
38.054675, -103.81205
This bridge is in worse condition than 10.7% of bridges in County 089. The average bridge in Colorado is 0 years old; this one is 60 years old.
Nearby Bridges
COUNTY ROAD EE over ROCKY FORD HIGHLINE CANA
Built 1975
COUNTY ROAD 15 over CATLIN CANAL
Built 2024
COUNTY ROAD FF over ROCKY FORD HIGHLINE CANA
Built 1966
COUNTY ROAD GG over OTERO CANAL
Built 1957
COUNTY ROAD 16 over OTERO CANAL
Built 1964
COUNTY ROAD 14 over OTERO CANAL
Built 1960
COUNTY ROAD 16 over CATLIN CANAL
Built 1998
COUNTY ROAD GG over CATLIN CANAL
Built 1962
COUNTY ROAD HH over CATLIN CANAL
Built 1954
US 50 ML over Patterson Hollow
Built 2001
Bridge Details
- Structure #
- OTFF-13.2-28-46
- Year Built
- 1966
- Length
- 7.4 m (24.3 ft)
- Max Span
- 6.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 154
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.