COUNTY ROAD JJ.5 over SMITH ARROYO
.8 MI S OF SH 50 · County 089, Colorado · Built 2003 · 2 Lanes · 135 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
38.105389, -103.894303
This bridge is in worse condition than 10.7% of bridges in County 089. The average bridge in Colorado is 0 years old; this one is 23 years old.
Nearby Bridges
US 50 ML over SMITH HOLLOW
Built 1997
COUNTY ROAD 11 over OTERO CANAL
Built 1964
COUNTY ROAD 9 over OTERO CANAL
Built 1966
COUNTY ROAD 11.25 over CATLIN CANAL
Built 1950
COUNTY ROAD 11 over ROCKY FORD HIGHLINE CANA
Built 1980
CANAL ROAD over CATLIN CANAL
Built 1976
SH 207 ML over CATLIN CANAL
Built 1963
N BEATY AVENUE over CATLIN CANAL
Built 2021
COUNTY ROAD JJ over OTERO CANAL
Built 1965
US 50 ML over CATLIN CANAL
Built 1969
Bridge Details
- Structure #
- OT10-9-31.5-26A
- Year Built
- 2003
- Length
- 36.6 m (120.1 ft)
- Max Span
- 35.4 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 135
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.