COUNTY ROAD Z over OTERO CANAL
.2 MI W OF CR 19 · County 089, Colorado · Built 1968 · 2 Lanes · 27 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.967897, -103.732253
This bridge is in worse condition than 65.8% of bridges in County 089. The average bridge in Colorado is 0 years old; this one is 58 years old.
Nearby Bridges
SH 71 ML over OTERO CANAL
Built 1950
COUNTY ROAD Z over CATLIN CANAL
Built 1969
COUNTY ROAD 19.5 over CATLIN CANAL
Built 1969
SH 71 ML over TIMPAS CREEK
Built 1948
SH 10 ML over CATLIN CANAL
Built 1969
SH 71 ML over OTERO CANAL
Built 1971
COUNTY ROAD BB over ROCKY FORD HIGHLINE CANA
Built 1964
SH 10 ML over TIMPAS CREEK
Built 1985
SH 71 ML over HIGHLINE CANAL
Built 2021
COUNTY ROAD 20 over ROCKY FORD HIGHLINE CANA
Built 1967
Bridge Details
- Structure #
- OT-Z-18-22-092
- Year Built
- 1968
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.3 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 27
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.