COUNTY ROAD E over SMITH CANYON
.5 MI SW OF SH 109 · County 089, Colorado · Built 1966 · 2 Lanes · 83 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
37.699525, -103.424136
This bridge is in worse condition than 65.8% of bridges in County 089. The average bridge in Colorado is 0 years old; this one is 60 years old.
Nearby Bridges
SH 109 ML over DRAW
Built 1972
SH 109 ML over SMITH CANYON
Built 1973
SH 109 ML over DRAW
Built 1973
SH 109 ML over PURGATOIRE RIVER
Built 1972
COUNTY ROAD 804 over GAUSSION CANYON
Built 1985
COUNTY ROAD 804 over VOGEL CANYON
Built 1998
SH 109 ML over MCMAHON ARROYO
Built 1972
COUNTY RD 90.0 over MUDDY CREEK
Built 1992
SH 109 ML over MUDDY CREEK
Built 1974
Bridge Details
- Structure #
- OT-E-35-04-208
- Year Built
- 1966
- Length
- 49.2 m (161.4 ft)
- Max Span
- 11.9 m
- Width
- 5.1 m (16.7 ft)
- Lanes
- 2
- Daily Traffic
- 83
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,555,000
- Total Project Cost
- $2,811,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.