COUNTY ROAD E over SMITH CANYON

.5 MI SW OF SH 109 · County 089, Colorado · Built 1966 · 2 Lanes · 83 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

37.699525, -103.424136

This bridge is in worse condition than 65.8% of bridges in County 089. The average bridge in Colorado is 0 years old; this one is 60 years old.

Nearby Bridges

Bridge Details

Structure #
OT-E-35-04-208
Year Built
1966
Length
49.2 m (161.4 ft)
Max Span
11.9 m
Width
5.1 m (16.7 ft)
Lanes
2
Daily Traffic
83
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,555,000
Total Project Cost
$2,811,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.