County Road 21 over Catlin Canal

0.2 Mi S of CR DD · County 089, Colorado · Built 2020 · 2 Lanes · 306 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
OT-21-B106-2020
Year Built
2020
Length
9.7 m (31.8 ft)
Max Span
7.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
306
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.