CR/N75 NOEL RD over SURFACE CREEK

.1 MI W OF SH 65 · County 029, Colorado · Built 1988 · 2 Lanes · 167 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
ORCHARD CITY-2A
Year Built
1988
Length
8.3 m (27.2 ft)
Max Span
7.5 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
167
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.