US 350 ML over PURGATOIRE RIVER

6.6 MI NE of JCT US160 · County 071, Colorado · Built 2014 · 2 Lanes · 730 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
O-19-R
Year Built
2014
Length
78.5 m (257.5 ft)
Max Span
27.7 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
730
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$408,000
Total Project Cost
$611,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.