I 25 ML NBND over TIMBER CANYON

8.3 MI NO OF JCT SH 239 · County 071, Colorado · Built 1969 · 2 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
O-18-CH
Year Built
1969
Length
27.4 m (89.9 ft)
Max Span
26.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
6,000
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.