120TH STREET over NWP

4.77 MI FROM I-25 · County 014, Colorado · Built 2002 · 2 Lanes · 4,189 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
NWP-04.77
Year Built
2002
Length
88.5 m (290.4 ft)
Max Span
42.4 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
4,189
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.