Sheridan Parkway over NWP
1.64 MI FROM I-25 · County 014, Colorado · Built 2002 · 3 Lanes · 5,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.984153, -105.018464
This bridge is in worse condition than 70% of bridges in County 014. The average bridge in Colorado is 0 years old; this one is 24 years old.
Nearby Bridges
Lowell Blvd. over NWP
Built 2002
Huron Street over NWP
Built 2002
Lowell Blvd NB over Lowell Channel
Built 2005
Lowell Blvd SB over Lowell Channel
Built 2005
Ramp H over I-25 and NWP
Built 2003
Ramp B over I-25 and NWP
Built 2003
Sheridan Pkwy SB over Local Drainage
Built 2009
Sheridan Pkwy NB over Local Drainage
Built 2009
HURON ST over SHAY DITCH
Built 2006
160TH AVE over I-25
Built 2003
Bridge Details
- Structure #
- NWP-01.64
- Year Built
- 2002
- Length
- 74.8 m (245.4 ft)
- Max Span
- 35.9 m
- Width
- 13.1 m (43 ft)
- Lanes
- 3
- Daily Traffic
- 5,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.