Co Rd 29.5 over Grand Valley Canal

.63Mi N of US6 · County 077, Colorado · Built 2017 · 2 Lanes · 4,180 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
MESA-29.5-E.63A
Year Built
2017
Length
13 m (42.7 ft)
Max Span
11.4 m
Width
18.6 m (61 ft)
Lanes
2
Daily Traffic
4,180
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.