I 25 ML NBND over APACHE CREEK

15.4 M N OF WALSENBURG · County 055, Colorado · Built 1985 · 2 Lanes · 7,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M-17-BC
Year Built
1985
Length
31 m (101.7 ft)
Max Span
12.2 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
7,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$266,000
Total Project Cost
$535,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.