County Road 70 over Box Elder Creek
100 ft E of Co Rd 9 · County 069, Colorado · Built 2024 · 3 Lanes · 3,852 vehicles/day
Overall
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.755167, -105.018803
This bridge is in worse condition than 29.9% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 2 years old.
Nearby Bridges
County Road 70 over North Poudre Canal
Built 2024
County Road 9 over North Poudre Canal
Built 1980
County Road 70 over Coal Creek
Built 1995
County Road 7 over North Poudre Canal
Built 2011
County Road 11 over North Poudre Canal
Built 1986
COUNTY ROAD 70 over I 25 ML
Built 1967
I 25 ML SBND over N.POUDRE DITCH SAND CRK
Built 1967
I 25 ML NBND over N.POUDRE DITCH SAND CRK
Built 1950
I 25 SERVICE RD over N.POUDRE DITCH SAND C SR
Built 1967
County Road 70 over North Poudre Canal
Built 1989
Bridge Details
- Structure #
- LR70-0.0-9-A
- Year Built
- 2024
- Length
- 16.6 m (54.5 ft)
- Max Span
- 14.8 m
- Width
- 22.5 m (73.8 ft)
- Lanes
- 3
- Daily Traffic
- 3,852
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.