County Road 54 over Box Elder Creek
0.5 Mi East of I-25 · County 069, Colorado · Built 1993 · 2 Lanes · 98 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
40.638933, -104.991453
This bridge is in worse condition than 33.6% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 33 years old.
Nearby Bridges
E County Road 52 over Unnamed Drain
Built 2015
COUNTY ROAD 52 over I 25 ML and FRONTAGE RD
Built 1966
County Road 56 over Box Elder Creek
Built 1997
County Road 56 over Larimer County Canal
Built 1940
County Road 52 over Larimer & Weld Canal
Built 1975
I 25 FRONTAGE RD over LARIMER COUNTY CANAL SR
Built 1966
I 25 ML NBND over LARIMER COUNTY CANAL
Built 1950
I 25 ML SBND over LARIMER COUNTY CANAL
Built 1966
I 25 SERVICE RD over LARIMER COUNTY CANAL SR
Built 1966
County Road 56 over Larimer County Canal
Built 1966
Bridge Details
- Structure #
- LR54-0.5-I25-A
- Year Built
- 1993
- Length
- 8.4 m (27.6 ft)
- Max Span
- 4.1 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 98
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.