County Road 68 over Harmony No. 1 Canal
At Junct. of Co Rd 95/68 · County 075, Colorado · Built 2001 · 2 Lanes · 13 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.924447, -102.672956
This bridge is in worse condition than 14.8% of bridges in County 075. The average bridge in Colorado is 0 years old; this one is 25 years old.
Nearby Bridges
County Road 93 over N. Sterling Outlet Canal
Built 2003
County Road 1 over Settlers Ditch
Built 1995
County Road 3 over Settlers Ditch
Built 1959
County Road 28 over Cottonwood Creek
Built 1992
County Road 66 over Harmony No. 1 Canal
Built 1991
County Road 5 over Cottonwood Creek
Built 1981
County Road 5 over Highline Canal
Built 1986
County Road 5 over Cottonwood & Settler
Built 1988
County Road 89 over Harmony No. 1 Canal
Built 1992
US 138 ML over COTTONWOOD CREEK
Built 1978
Bridge Details
- Structure #
- LOG68-95-208A
- Year Built
- 2001
- Length
- 15.8 m (51.8 ft)
- Max Span
- 14.3 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 13
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.