County Road 39 over Sterling Seep Ditch No 1
20 Ft N of Co Rd 30.5 · County 075, Colorado · Built 1992 · 2 Lanes · 1,820 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
40.656019, -103.2217
This bridge is in worse condition than 45.1% of bridges in County 075. The average bridge in Colorado is 0 years old; this one is 34 years old.
Nearby Bridges
County Road 39 over Sterling No 1 Ditch
Built 1988
CR 30.7 Vansway Dr over Sterling No 1 Ditch
Built 1960
County Road 41 over Sterling No 1 Ditch
Built 1950
County Road 30 over Pioneer Drainage Ditch
Built 1996
County Road 34 over Sterling Ditch No 1
Built 1994
US 138 ML over LOW LINE DITCH
Built 1955
County Road 34 over N. Sterling Inlet Canal
Built 1987
Platte Street over Pioneer Drainage Ditch
Built 1995
Platte Street over Sterling Ditch No. 1
Built 2003
SH 14 ML over NORTH STERLING CANAL
Built 1947
Bridge Details
- Structure #
- LOG39-30.5-256
- Year Built
- 1992
- Length
- 8.1 m (26.6 ft)
- Max Span
- 7.2 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,820
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.