County Road 26 over N. Sterling Inlet Canal
0.1 Mile East of County R · County 075, Colorado · Built 1940 · 2 Lanes · 73 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 3 | Serious |
Location
40.609514, -103.318272
This bridge is in worse condition than 99.5% of bridges in County 075. The average bridge in Colorado is 0 years old; this one is 86 years old.
Nearby Bridges
County Road 25 over N. Sterling Inlet Canal
Built 1969
County Road 24 over Pawnee Ditch
Built 2004
County Road 25 over Pawnee Creek
Built 1989
County Road 22 over Pawnee Ditch
Built 1995
County Road 23 over N. Sterling Inlet Canal
Built 1999
County Road 20.5 over Pawnee Creek
Built 1991
County Road 29 over Pawnee Creek
Built 1969
County Road 35 over Pawnee Ditch
Built 1992
County Road 20 over Pawnee Ditch
Built 2011
County Road 35 over Springdale Ditch
Built 1993
Bridge Details
- Structure #
- LOG26-29.0-60
- Year Built
- 1940
- Length
- 9.4 m (30.8 ft)
- Max Span
- 8.8 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 73
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $684,000
- Total Project Cost
- $752,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.