PIERCE STREET over SANDERSON GULCH

JUST N OF MEXICO DRIVE · County 059, Colorado · Built 1974 · 2 Lanes · 7,747 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
LKWD-03-0.50-01
Year Built
1974
Length
10.1 m (33.1 ft)
Max Span
4.8 m
Width
19.1 m (62.7 ft)
Lanes
2
Daily Traffic
7,747
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.