COUNTY ROAD 26 over BIG SANDY CREEK

1.0 MI S OF HIGHWAY 40 · County 073, Colorado · Built 1998 · 2 Lanes · 55 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

39.190728, -103.584389

This bridge is in worse condition than 29.1% of bridges in County 073. The average bridge in Colorado is 0 years old; this one is 28 years old.

Nearby Bridges

Bridge Details

Structure #
LIN-26-3A.4A
Year Built
1998
Length
42.7 m (140.1 ft)
Max Span
20.5 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
55
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.