COUNTY RD 75.0 over LEITENSDORFER ARROYO
1.4 MI S OF HOEHNE RD · County 071, Colorado · Built 1950 · 2 Lanes · 70 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
37.273522, -104.467539
This bridge is in worse condition than 85.9% of bridges in County 071. The average bridge in Colorado is 0 years old; this one is 76 years old.
Nearby Bridges
COUNTY RD 75.0 over CHICOSA CANYON CREEK
Built 1993
COUNTY RD 79.0 over FEEDER DITCH
Built 1945
I 25 ML NBND over RR SPUR
Built 1969
I 25 ML SBND over RR SPUR
Built 1969
COUNTY RD 79.0 over LEITENSDORFER ARROYO
Built 1990
COUNTY RD 75.0 over PICKETWIRE DITCH
Built 1930
COUNTY RD 42.0 over FEEDER DITCH
Built 1980
COUNTY RD 75.0 over UNNAMED NATURAL DRAINAGE
Built 1984
I 25 ML NBND over TINGLEY CANYON
Built 1969
I 25 ML SBND over TINGLEY CANYON
Built 1997
Bridge Details
- Structure #
- LA75-38-20-53
- Year Built
- 1950
- Length
- 9.1 m (29.9 ft)
- Max Span
- 7.9 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 70
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $670,000
- Total Project Cost
- $737,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.