COUNTY RD 4.4 over TRINCHERA CREEK
3 MI E OF CR 113 · County 071, Colorado · Built 1950 · 1 Lanes · 6 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
37.019372, -104.084186
This bridge is in worse condition than 85.9% of bridges in County 071. The average bridge in Colorado is 0 years old; this one is 76 years old.
Nearby Bridges
COUNTY RD 8.8 over TRINCHERA CREEK
Built 1940
COUNTY RD 6.8 over UNNAMED NATURAL DRAINAGE
Built 1940
COUNTY RD 6.8 over SALAZAR ARROYO
Built 1968
COUNTY RD 6.8 over CHANNEY ARROYO
Built 1930
COUNTY RD 113.0 over SALT CREEK
Built 1940
COUNTY RD 8.8 over RITO SECO CREEK
Built 1930
COUNTY RD 8.8 over SAN ISIDRO CREEK
Built 1994
COUNTY RD 105.5 over RITO AGUA DULCE
Built 1935
COUNTY RD 105.5 over GURULE ARROYO
Built 1945
US 160 ML over TRINCHERA CREEK
Built 1999
Bridge Details
- Structure #
- LA4.4-59-2-95
- Year Built
- 1950
- Length
- 25 m (82 ft)
- Max Span
- 24.2 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 6
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $709,000
- Total Project Cost
- $886,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.