US 50 ML over SMITH ARROYO

9.8 MI E OF LAMAR · County 099, Colorado · Built 1987 · 2 Lanes · 1,900 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
L-27-AM
Year Built
1987
Length
18.7 m (61.4 ft)
Max Span
6.1 m
Width
21 m (68.9 ft)
Lanes
2
Daily Traffic
1,900
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.